The correct answer for the question that is being presented above is this one: Based on the table that is shown from my research, As it stands now, the total cost in millions of dollars is:
47.0 + 2.5 = 49.5
Now, if half of the full-time workers become part time, then the total cost will be
= 47.0 * [(1740 − 0.5 * 1740) /1740] + 2.5 * [(170 + 0.5 * 1740) / 170] = 23.50 + 15.29 = 38.79 Then the answer will be 38.79