katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

Which peninsula is circled in red on the map above? A. the Indian Peninsula B. the Korean Peninsula C. the Malay Peninsula D. the Kamchatka Peninsula
Besides the economy, what was the biggest difference between the Northern and Southern states?
–621 = h + –734 solve for h
The reformers of the Anglican Church came to be called a. Anabaptists. c. Amish. b. Puritans. d. Mennonites. Please select the best answer from the choices prov
which two branches were not included in the articles confederation?​
AABC is a right triangle. If AC = 12 and BC = 13, find AB. 5 25 2 18
what is 2-(7/8-3/4)
Take a look at this online dictionary entry. language Etymology Middle English language, from Old French language, from Latin lingua ("tongue, speech, language”
What numbers would make 4a ≤ 16 true?
if an object in motion, experiences a net zero unbalanced force, the the body 1) will always remain at rest 2) cannot remain at rest 3) can be accelarated 4)