Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

Assume the AC generator produce the signal voltage as two sine waves where v = C sin (50 +90)t use compound angle identities to combine individual sine waves in
18 What is the perimeter of this shape? 7 cm 7 cm 7 cm cm 7 cm 7 cm 7 cm
the length of a rectangular is one less than twice the width. Find the length + width, if the perimeter is 40
How would ancient astronomers from Silla have observed the movement of stars and other objects compared to astronomers today?
Which word best fills in the blank? The height of land above sea level is called altitude or O plateau O elevation Olatitude O direction
What happens to earnings in a cooperative?
why did el patron save matt’s brain in the first place
How do you drown a blonde?
Charlie took a nap. He fell asleep at 11:25 AM and he woke up at 3:12 PM. How long did he sleep?
25. Smoke and fog together give rise to: global warming smog ozone depletion acid rain